Photovoltaic

The Plant is composed of the two (2) following PV facilities:

  • One (1) complete PV facility included in the CT Unit with a net export capacity of 217 MWac.
  • One (1) complete PV facility included in the PT3 Unit with a net export capacity of 33 MWac.

The Plant is to be located within the Project Site boundary and adjacent to the CSP Plant/s to be built by the Contractor.

Electrical interconnection will be done at the 400kV Intermediate Substation.

N type monocrystalline bifacial PV module (full frame):

  • PV Full Dispatch Subsystem 1 – 400Wp Installation capacity 127.5008MWp, 405Wp Installation capacity 150.255MWp, total 277.7558MWp (total front side peak power).
  • PV Full Dispatch Subsystem 2 – 415Wp Installation capacity 42.25032MWp (total front side peak power).